Dromb Concrete Form Liner

Dromb / 0614

Concrete Form Liner

Product Code Dimensions (mm) Uses
ESX/0614 - Dromb 330 x 1000 100

ESSEFLEX FORM LINERS (ESX)

Form liners manufactured from polyurethane material.

Suggested for panels with large dimensions (more than 3m2), without joints.

Up to 100 re-uses.

  • Data Sheet

    Data Sheet (Download)

Alternatives

Share by: